Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Les Landelières

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place La Rosière 
resort Espace San Bernardo 
Region Rhône-Alpes 
Country   
Name of lift Les Landelières 
Type 3-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1985 
Commissioning date ?? 
Date of closing down ?? 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1951 m
Height of middle station(s) ?? m
Height of mountain station 2400 m
Vertical rise 449 m
Route distance 1823 m
Horizontal length ?? m
Average incline 26 %
Largest incline 50 %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1530 Pers/h
Travel time 13,25 min
Driving speed line 2,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating duckboard (plastic) 
Seat heater no 
Persons per cab
Number of cabs 161 Stk
Cab distance 22,7 m
Cab interval 9,8 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/06/23
PHOTOS: ??

Lift-Statistics
6214 visit(s) since 07/06/04
Last visit 26/11/24

LIFT-WORLD IDs
Lift-ID: 4455
Place-ID: 1066

https://www.seilbahntechnik.net/en/lifts/4455/datas.htm