Lift-Database » Lifts in the world
75-FUC Mendelbahn
Line
Line
Line
General information | |
---|---|
Place | Kaltern / Caldaro |
resort | ?? |
Region | Trentino-South Tyrol |
Country | |
Name of lift | Mendelbahn |
Type | 75-FUC |
Lift manufacturer | Agudio |
Year of construction | 1903/09 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 510 m |
Height of mountain station | 1364 m |
Vertical rise | 854 m |
Route distance | 2368 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | 64 % |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 400 Pers/h |
Travel time | 12 min |
Driving speed line | 4 m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Sigma |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 75 |
Number of cabs | 2 Stk |
Carriage Operator | ?? |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Length of counter-rope | ?? m |
Total weight of haul rope | ?? t |
Total weight of counter-rope | ?? t |
Haul rope diameter | ?? mm |
Counter-rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Nominal strength of counter-rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Breaking strength of counter-rope | ?? kN |
Tensionstation haulrope | ?? |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Construction costs | ?? ITL |
Currency (Construction costs) | Italian lira |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
Type of turnout | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 30/08/24
PHOTOS: ??
Lift-Statistics
16110 visit(s) since 25/02/05
Last visit 27/12/24
LIFT-WORLD IDs
Lift-ID: 4478
Place-ID: 1430
https://www.seilbahntechnik.net/en/lifts/4478/datas.htm
Datas: 30/08/24
PHOTOS: ??
Lift-Statistics
16110 visit(s) since 25/02/05
Last visit 27/12/24
LIFT-WORLD IDs
Lift-ID: 4478
Place-ID: 1430
https://www.seilbahntechnik.net/en/lifts/4478/datas.htm