Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Vals-Gadastatt

Base terminal
Base terminal

Inside base terminal
Inside base terminal

View on route
View on route

General information  
Place Vals 
resort ?? 
Region Grisons 
Country   
Name of lift Vals-Gadastatt 
Type 8-MGD 
Lift manufacturer Garaventa 
Year of construction 2004 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1286 m
Height of mountain station 1820 m
Vertical rise 534 m
Route distance 1791 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 6,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 382 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA III-8 LWI 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 34 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/03/20
PHOTOS: ??

Lift-Statistics
9221 visit(s) since 22/08/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 4969
Place-ID: 2510

https://www.seilbahntechnik.net/en/lifts/4969/datas.htm