Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Crans - Cry d'Er

Middle Station
Middle Station

Middle Station
Middle Station

General information  
Place Montana 
resort Crans Montana - Aminona 
Region Valais 
Country   
Name of lift Crans - Cry d'Er 
Type 8-MGD 
Lift manufacturer Garaventa 
Year of construction 1998 
Commissioning date 12 / 1998 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1517 m
Height of middle station(s) ?? m
Height of mountain station 2267 m
Vertical rise 750 m
Route distance 3138 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 Pers/h
Travel time 10 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 908 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA III-8 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs ?? Stk
Cab distance 123 m
Cab interval 20,5 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/07/23
PHOTOS: ??

Lift-Statistics
11763 visit(s) since 06/09/04
Last visit 25/11/24

LIFT-WORLD IDs
Lift-ID: 5033
Place-ID: 2114

https://www.seilbahntechnik.net/en/lifts/5033/datas.htm