Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Alpkogelbahn


Valley station
Valley station

Mountain station
Mountain station

Pylone
Pylone


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Galtuer
resort

Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Alpkogelbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2004 
Commissioning date ??

geometric data  
Height of valley station 1642 m
Height of mountain station 1974 m
Vertical rise 332 m
Route distance 1399 m
Horizontal length 1355 m
Average incline 24,5 %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,03 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 539 kW
Drive power (Operation) 438 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA III-8 LWI
Seating ??
Seat heater ??
Heater no
Aircon no
Persons per cab
Number of cabs 32 Stk
Cab distance 87,48 m
Cab interval 14,58 s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ??
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 07/12/16 16:09:03
PHOTOS: 23/05/05 18:17:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
14356 visit(s) since 10/03/05
Last visit 22/08/19

LIFT-WORLD IDs
Lift-ID: 5053
Place-ID: 28

https://www.seilbahntechnik.net/en/lifts/5053/datas.htm