Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Kreuzjochbahn 1












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Fulpmes
resort Schlick 2000
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Kreuzjochbahn 1 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1995 
Commissioning date ??

geometric data  
Height of valley station 1014 m
Height of mountain station 1350 m
Vertical rise 336 m
Route distance 878 m
Horizontal length ?? m
Average incline 43,70 %
Largest incline 68,40 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 2,93 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 410 kW
Drive power (Operation) 320 kW
Brake power -280 kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive ??
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DS 106
Cab manufacturer CWA
Cab model OMEGA 6s
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 47 Stk
Cab distance 54 m
Cab interval 10,8 s
Garage type ground floor
Garage place valley station
Garage direction backward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/11/20 07:47:54
PHOTOS: 05/12/06 21:16:00

Lift-Statistics
14219 visit(s) since 27/08/03
Last visit 16/10/21

LIFT-WORLD IDs
Lift-ID: 509
Place-ID: 70

https://www.seilbahntechnik.net/en/lifts/509/datas.htm