Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Garnitzen I












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Hermagor
resort Nassfeld
Region Carinthia, Kärnten
Country AT Austria, Österreich
Name of lift Garnitzen I 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date ??

geometric data  
Height of valley station 1541 m
Height of mountain station 1878 m
Vertical rise 337 m
Route distance 1419 m
Horizontal length ?? m
Average incline ?? %
Largest incline 56,20 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2421 Pers/h
Travel time 4,85 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 530 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 68 Stk
Cab distance ?? m
Cab interval 8,92 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 23/02/09 17:12:00
PHOTOS: 01/03/09 11:12:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12120 visit(s) since 07/08/03
Last visit 02/04/20

LIFT-WORLD IDs
Lift-ID: 519
Place-ID: 193

https://www.seilbahntechnik.net/en/lifts/519/datas.htm