Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


15-MGD Frattazza-Tognola












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place San Martino di Castrozza
resort Dolomiti Superski

Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Frattazza-Tognola 
Type 15-MGD 
Lift manufacturer Leitner 
Year of construction 1997 
Commissioning date ??

geometric data  
Height of valley station 1401 m
Height of mountain station 2139 m
Vertical rise 738 m
Route distance 2304 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2500 Pers/h
Travel time 7 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 1060 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Fibercar
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab 15 
Number of cabs 50 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 17/11/15 21:36:24
PHOTOS: 24/03/07 11:06:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11053 visit(s) since 09/11/04
Last visit 06/12/19

LIFT-WORLD IDs
Lift-ID: 5192
Place-ID: 1575

https://www.seilbahntechnik.net/en/lifts/5192/datas.htm