Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Innerwengen

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Wengen 
resort Jungfrau 
Region Berne 
Country   
Name of lift Innerwengen 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 2004 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1273 m
Height of mountain station 1506 m
Vertical rise 233 m
Route distance 608 m
Horizontal length ?? m
Average incline 34,1 %
Largest incline 90,8 %
Number of pillars 6 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 2,03 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 240 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 30 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/10/24
PHOTOS: ??

Lift-Statistics
9875 visit(s) since 01/01/05
Last visit 23/12/24

LIFT-WORLD IDs
Lift-ID: 5341
Place-ID: 1734

https://www.seilbahntechnik.net/en/lifts/5341/datas.htm