Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Eisfluh

Valley Station
Valley Station

Line
Line

Line
Line

General information  
Place Zermatt 
resort Matterhorn Ski Paradise 
Region Valais 
Country   
Name of lift Eisfluh 
Type 2-CLF 
Lift manufacturer von Rotz 
Year of construction 2002 
Commissioning date ?? 
Second-hand lift. Formerly lift no. 18102 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Second-Hand lift from Adelboden

geometric data  
Height of valley station 2195 m
Height of middle station(s) ?? m
Height of mountain station 2261 m
Vertical rise 66 m
Route distance 354 m
Horizontal length ?? m
Average incline 18,6 %
Largest incline ?? %
Number of pillars 5 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 600 Pers/h
Travel time 2,9 min
Driving speed line 2,0 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Garaventa 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 46 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/02/24
PHOTOS: ??

Lift-Statistics
14510 visit(s) since 13/01/05
Last visit 23/11/24

LIFT-WORLD IDs
Lift-ID: 5464
Place-ID: 2017

https://www.seilbahntechnik.net/en/lifts/5464/datas.htm