Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


12-MGD Pecol - Pian del Crep









Infos for handicapped persons
Sorry, no information available.

Characteristics
http://www.funivie.org/pagine/speciali/mgd_pian_del_crep/index.php

General information  
Place Zoldo Alto
resort
Dolomiti Superski
Region Veneto
Country IT Italy, Italia
Name of lift Pecol - Pian del Crep 
Type 12-MGD 
Lift manufacturer Leitner 
Year of construction 1989 
Commissioning date ??

geometric data  
Height of valley station 1399 m
Height of middle station(s) ?? m
Height of mountain station 1766 m
Vertical rise 367 m
Route distance 1191 m
Horizontal length 1120,85 m
Average incline 34 %
Largest incline 79,1 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3600 Pers/h
Travel time 3,2 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Redaelli 
Length of haul rope 2600 m
Total weight of haul rope 25,2 t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 1088 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Fibercar
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab 12 
Number of cabs 43 Stk
Cab distance 72 m
Cab interval 12 s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 09/11/15 21:53:22
PHOTOS: 08/01/13 14:27:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8845 visit(s) since 12/02/05
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 5515
Place-ID: 1665

https://www.seilbahntechnik.net/en/lifts/5515/datas.htm