Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  24-FUT Gletscherjet I

Valley station
Valley station

Line
Line

Line
Line

General information  
Place Kaprun 
resort Lechnerberg 
Region Salzburg 
Country   
Name of lift Gletscherjet I 
Type 24-FUT 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date 23/12/01 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 913 m
Height of mountain station 1978 m
Vertical rise 1065 m
Route distance 2456 m
Horizontal length ?? m
Average incline ?? %
Largest incline 92,26 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 (4000) Pers/h
Travel time 6,8 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 2800 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model FUNITEL 24 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 24 
Number of cabs 31 (40) Stk
Cab distance ?? m
Cab interval 31,9 (24,7) s
Garage type ground floor 
Garage place valley and mountain 
Garage direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 10400 m
Total weight of haul rope 107 t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/02/23
PHOTOS: ??

Lift-Statistics
35988 visit(s) since 20/11/02
Last visit 15/10/24

LIFT-WORLD IDs
Lift-ID: 56
Place-ID: 5

https://www.seilbahntechnik.net/en/lifts/56/datas.htm