Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLD Clos Bertrand



General information  
Place Allos 
resort ?? 
Region Provence-Alpes-Côte d'Azur 
Country   
Name of lift Clos Bertrand 
Type 3-CLD 
Lift manufacturer Poma 
Year of construction 1974/75 
Commissioning date 02 / 1975 
Date of closing down 2014 
Date of pull down 2014 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Constructed in just 4 months!

geometric data  
Height of valley station 1513 m
Height of middle station(s) ?? m
Height of mountain station 1899 m
Vertical rise 386 m
Route distance 1300 m
Horizontal length 1234 m
Average incline ?? %
Largest incline 55 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 5,5 min
Driving speed line 4 m/s
Driving speed station 0,5 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 92 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? FRF
Currency (Construction costs) French franc 
Construction period 4 months
Seasontime ❄ ☀ all-season 
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system no 
Rope position control no 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 6 apr 2026
PHOTOS: ??

Lift-Statistics
8399 visit(s) since 30 giu 2005
Last visit 14 mag 2026

LIFT-WORLD IDs
Lift-ID: 6010
Place-ID: 941

https://www.seilbahntechnik.net/en/lifts/6010/datas.htm