Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Belchen Seilbahn

Valley station
Valley station

Valley station
Valley station

Mountain station
Mountain station

General information  
Place Schönau 
resort ?? 
Region Baden-Wuerttemberg 
Country   
Name of lift Belchen Seilbahn 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2001 
Commissioning date 2001 
Second-hand lift. Formerly lift no. 8123 


Infos for handicapped persons
suitable for hadicapped people!

Characteristics
nothing

geometric data  
Height of valley station 1098 m
Height of mountain station 1363 m
Vertical rise 265 m
Route distance 1106,17 m
Horizontal length 1073,40 m
Average incline 24,41 %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 3,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 340 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating none 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 8 
Number of cabs 29 Stk
Cab distance 96 m
Cab interval 19,2 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? DEM
Currency (Construction costs) Deutsche Mark 
Construction period 5 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Aug 4, 2026
PHOTOS: ??

Lift-Statistics
14818 visit(s) since Dec 25, 2002
Last visit Oct 18, 2026

LIFT-WORLD IDs
Lift-ID: 648
Place-ID: 1946

https://www.seilbahntechnik.net/en/lifts/648/datas.htm