Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Alpauris

Middle Station
Middle Station

Mountain Station
Mountain Station

Line
Line

General information  
Place Alpe d'Huez 
resort Alpe d'Huez 
Region Rhône-Alpes 
Country   
Name of lift Alpauris 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 1988 
Commissioning date 1988 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1703 m
Height of middle station(s) 1514 m
Height of mountain station 1805 m
Vertical rise 102 m
Route distance 1437 m
Horizontal length 1301 m
Average incline 38 %
Largest incline 81 %
Number of pillars 28 Stk
Greatest spanwidth 132 m
Max ground clearance 25 m
Trackwidth drive 3,4 m
Trackwidth line 4,2 m
Trackwidth return 3,55 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 650 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 105 Stk
Cab distance 30 m
Cab interval 6 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40,5 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 07/04/24
PHOTOS: ??

Lift-Statistics
14649 visit(s) since 04/07/05
Last visit 20/04/24

LIFT-WORLD IDs
Lift-ID: 7135
Place-ID: 229

https://www.seilbahntechnik.net/en/lifts/7135/datas.htm