Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLF Bergers


Mountain Station
Mountain Station

Line
Line

Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Alpe d'Huez
resort Alpe d`Huez
Region Rhône-Alpes
Country FR France
Name of lift Bergers 
Type 4-CLF 
Lift manufacturer Poma 
Year of construction 1986 
Commissioning date 1986
Date of closing down 2018
Date of pull down 2018

geometric data  
Height of valley station 1800 m
Height of middle station(s) ?? m
Height of mountain station 1820 m
Vertical rise 20 m
Route distance 631 m
Horizontal length ?? m
Average incline 3 %
Largest incline 15 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,5 min
Driving speed line 2,3 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs 106 Stk
Cab distance 12 m
Cab interval 5,2 s

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 03/05/20 17:07:49
PHOTOS: 18/06/10 20:05:00

Lift-Statistics
7534 visit(s) since 26/08/05
Last visit 18/09/21

LIFT-WORLD IDs
Lift-ID: 7136
Place-ID: 229

https://www.seilbahntechnik.net/en/lifts/7136/datas.htm