Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Fontbelle

Mountain Station
Mountain Station

General information  
Place Alpe d'Huez 
resort Alpe d'Huez 
Region Rhône-Alpes 
Country   
Name of lift Fontbelle 
Type 4-CLF 
Lift manufacturer Poma 
Year of construction 1994 
Commissioning date 1994 
Date of closing down 2009 
Date of pull down 2009 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift, former Puy Chalvin (built year 1988)

geometric data  
Height of valley station 1800 m
Height of mountain station 2131 m
Vertical rise 331 m
Route distance 1747 m
Horizontal length ?? m
Average incline 19 %
Largest incline 38 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2057 Pers/h
Travel time 12 min
Driving speed line 2,5 m/s

electrical data  
Electrical control BBC 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 210 Stk
Cab distance 16,63 m
Cab interval 6,7 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/12/17
PHOTOS: ??

Lift-Statistics
6361 visit(s) since 01/09/05
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 7139
Place-ID: 229

https://www.seilbahntechnik.net/en/lifts/7139/datas.htm