Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGFP Vaujany - Enversin

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Vaujany 
resort Alpe d`Huez 
Region Rhône-Alpes 
Country   
Name of lift Vaujany - Enversin 
Type 10-MGFP 
Lift manufacturer GMM 
Year of construction 1991 
Commissioning date 1991 
Date of closing down 2017 
Date of pull down 2017 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1137 m
Height of middle station(s) ?? m
Height of mountain station 1250 m
Vertical rise 113 m
Route distance 610 m
Horizontal length ?? m
Average incline 19 %
Largest incline 40 %
Number of pillars 2 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 607 Pers/h
Travel time 5,5 min
Driving speed line 5,0 m/s
Speed on towers ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Montaz Mautino 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 12 Stk


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/02/19
PHOTOS: ??

Lift-Statistics
9714 visit(s) since 14/07/05
Last visit 31/05/23

LIFT-WORLD IDs
Lift-ID: 7246
Place-ID: 1244

https://www.seilbahntechnik.net/en/lifts/7246/datas.htm