Lift-Database » Lifts in the world
8-MGD Stuckli Rondo

Valley Station

Mountain Station

Mountain Station
General information | |
---|---|
Place | Sattel |
resort | Sattel-Hochstuckli |
Region | Schwyz |
Country | ![]() |
Name of lift | Stuckli Rondo |
Type | 8-MGD |
Lift manufacturer | Garaventa |
Year of construction | 2005 |
Commissioning date | 17.07.2005 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 800 m |
Height of middle station(s) | ?? m |
Height of mountain station | 1200 m |
Vertical rise | 404 m |
Route distance | 1736,45 m |
Horizontal length | ?? m |
Average incline | 42 % |
Largest incline | ?? % |
Number of pillars | 9 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 6,1 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 700 Pers/h |
Travel time | 7,0 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | SISAG |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 409 kW |
Drive power (Operation) | 245 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | CWA |
Cab model | CONUS 8 |
Seating | carpet |
Seat heater | no |
Heater | ?? |
Aircon | ?? |
Persons per cab | 8 |
Number of cabs | 20 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | ground floor |
Garage place | valley station |
Garage direction | forward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 44 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 5 months |
Seasontime | ?? |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 26.10.2023
PHOTOS: ??
Lift-Statistics
15584 visit(s) since 18.07.2005
Last visit 21.04.2025
LIFT-WORLD IDs
Lift-ID: 7288
Place-ID: 131
https://www.seilbahntechnik.net/en/lifts/7288/datas.htm
Datas: 26.10.2023
PHOTOS: ??
Lift-Statistics
15584 visit(s) since 18.07.2005
Last visit 21.04.2025
LIFT-WORLD IDs
Lift-ID: 7288
Place-ID: 131
https://www.seilbahntechnik.net/en/lifts/7288/datas.htm