Lift-Database » Lifts in the world
8-MGD L'Étoile Filante
Valley station
General information | |
---|---|
Place | Beaupré |
resort | Mont-Sainte-Anne |
Region | Québec |
Country | |
Name of lift | L'Étoile Filante |
Type | 8-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 1989 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
possible with assistance |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 175 m |
Height of middle station(s) | ?? m |
Height of mountain station | 800 m |
Vertical rise | 625 m |
Route distance | 2347 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 27 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 3000 Pers/h |
Travel time | 8 min |
Driving speed line | 4,89 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | CWA |
Cab model | ?? |
Seating | carpet |
Seat heater | no |
Heater | ?? |
Aircon | ?? |
Persons per cab | 8 |
Number of cabs | 100 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | ground floor |
Garage place | valley and mountain |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ???? months |
Seasontime | ?? |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 18/07/20
PHOTOS: ??
Lift-Statistics
6033 visit(s) since 20/07/05
Last visit 21/11/24
LIFT-WORLD IDs
Lift-ID: 7293
Place-ID: 2882
https://www.seilbahntechnik.net/en/lifts/7293/datas.htm
Datas: 18/07/20
PHOTOS: ??
Lift-Statistics
6033 visit(s) since 20/07/05
Last visit 21/11/24
LIFT-WORLD IDs
Lift-ID: 7293
Place-ID: 2882
https://www.seilbahntechnik.net/en/lifts/7293/datas.htm