Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Mossettes Express

Line
Line

General information  
Place Avoriaz 
resort Portes du Soleil 
Region Rhône-Alpes 
Country   
Name of lift Mossettes Express 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 1993 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1832 m
Height of mountain station 2501 m
Vertical rise 669 m
Route distance 2376 m
Horizontal length 2279 m
Average incline 29 %
Largest incline 88 %
Number of pillars 24 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 3,4 m
Trackwidth line 4,9 m
Trackwidth return 3,8 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 940 kW
Drive power (Operation) 700 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 162 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40,5 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14.06.2025
PHOTOS: ??

Lift-Statistics
9340 visit(s) since 11.08.2005
Last visit 03.07.2025

LIFT-WORLD IDs
Lift-ID: 7366
Place-ID: 957

https://www.seilbahntechnik.net/en/lifts/7366/datas.htm