Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Ki-West-Bahn (Kreuzjöchlsee)

Mountain station
Mountain station

Valley station
Valley station

Strecke with mountain station
Strecke with mountain station

General information  
Place Westendorf 
resort SkiWelt 
Region Tyrol 
Country   
Name of lift Ki-West-Bahn (Kreuzjöchlsee) 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2005/20 
Commissioning date 2005 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 945 m
Height of middle station(s) ?? m
Height of mountain station 1744 m
Vertical rise 799,00 m
Route distance 3056,00 m
Horizontal length ?? m
Average incline 27,76 %
Largest incline 70 %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 8 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA III-8 LWI 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 63 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 6084,00 m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) 120 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/02/24
PHOTOS: ??

Lift-Statistics
32242 visit(s) since 26/07/05
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 7379
Place-ID: 72

https://www.seilbahntechnik.net/en/lifts/7379/datas.htm