Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  74-FUC Seilbahn zum Waldfriedhof

Valley Sation
Valley Sation

Technical details
Technical details

Controls
Controls

General information  
Place Stuttgart 
resort ?? 
Region Baden-Wuerttemberg 
Country   
Name of lift Seilbahn zum Waldfriedhof 
Type 74-FUC 
Lift manufacturer ME 
Year of construction 1929/04 
Commissioning date 30/10/29 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 297 m
Height of mountain station 382 m
Vertical rise 85 m
Route distance 536 m
Horizontal length ?? m
Average incline ?? %
Largest incline 28,2 %
Trackwidth drive ?? m
Trackwidth line 1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1100 Pers/h
Travel time 4 min
Driving speed line 3,1 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 110 kW
Drive power (Operation) 70 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating duckboard (timber) 
Seat heater no 
Heater yes 
Aircon no 
Persons per cab 74 
Number of cabs 2 Stk
Carriage Operator yes 


rope data  
Rope manufacturer ?? 
Length of haul rope 600 m
Length of counter-rope ?? m
Total weight of haul rope 3,43 t
Total weight of counter-rope ?? t
Haul rope diameter 35 mm
Counter-rope diameter 18 mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime ❄ ☀ all-season 
Type of turnout ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/03/23
PHOTOS: ??

Lift-Statistics
10990 visit(s) since 19/03/05
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 752
Place-ID: 1963

https://www.seilbahntechnik.net/en/lifts/752/datas.htm