Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Korer












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Bruneck / Brunico
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Korer 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2005 
Commissioning date ??

geometric data  
Height of valley station 936,20 m
Height of mountain station 1091,00 m
Vertical rise 154,80 m
Route distance 1008,64 m
Horizontal length 995,65 m
Average incline ?? %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,50 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2880 Pers/h
Travel time ?? min
Driving speed line 6,00 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 460 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA III-8 LWI
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 43 Stk
Cab distance 60,00 m
Cab interval 12,00 s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 09/11/15 21:32:33
PHOTOS: 25/02/06 11:26:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12779 visit(s) since 19/09/05
Last visit 15/12/19

LIFT-WORLD IDs
Lift-ID: 7917
Place-ID: 1329

https://www.seilbahntechnik.net/en/lifts/7917/datas.htm