Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGFP Croisette

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Les Menuires 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Croisette 
Type 4-MGFP 
Lift manufacturer Montaz Mautino 
Year of construction 1983 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1710 m
Height of middle station(s) ?? m
Height of mountain station 1801 m
Vertical rise 91 m
Route distance 372 m
Horizontal length ?? m
Average incline ?? %
Largest incline 49 %
Number of pillars 5 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 900 Pers/h
Travel time ?? min
Driving speed line 4,5 m/s
Speed on towers ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating none 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 16 Stk


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 39 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 81130 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/08/20
PHOTOS: ??

Lift-Statistics
12587 visit(s) since 16/11/05
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 8479
Place-ID: 1109

https://www.seilbahntechnik.net/en/lifts/8479/datas.htm