Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Roc des 3 Marches

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Les Menuires 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Roc des 3 Marches 
Type 4-MGD 
Lift manufacturer Poma 
Year of construction 1969 
Commissioning date 1969 
Date of closing down 2005 
Date of pull down 2005 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1810 m
Height of mountain station 2397 m
Vertical rise 587 m
Route distance 1871 m
Horizontal length ?? m
Average incline ?? %
Largest incline 52 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 925 Pers/h
Travel time 8,32 min
Driving speed line 3,75 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 250 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 102 Stk
Cab distance 45 m
Cab interval 12 s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 20/11/23
PHOTOS: ??

Lift-Statistics
8540 visit(s) since 10/11/05
Last visit 23/12/24

LIFT-WORLD IDs
Lift-ID: 8485
Place-ID: 1109

https://www.seilbahntechnik.net/en/lifts/8485/datas.htm