Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Schönjochbahn 1


Line
Line

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Through operation with Schönjochbahn 2.

General information  
Place Fiss
resort Serfaus-Fiss-Ladis
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Schönjochbahn 1 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date ??

geometric data  
Height of valley station 1476,2 m
Height of mountain station 1920 m
Vertical rise 443,75 m
Route distance 1566,26 m
Horizontal length ?? m
Average incline 29,54 %
Largest incline 51,61 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 4,5 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 798 kW
Drive power (Operation) 645 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA III-8 LWI
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 63 Stk
Cab distance 61,71 m
Cab interval 10,29 s
Garage type ground floor
Garage place Middle station(s)
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/03/19 20:07:51
PHOTOS: 15/08/04 17:29:36

Lift-Statistics
21765 visit(s) since 20/11/02
Last visit 14/08/20

LIFT-WORLD IDs
Lift-ID: 855
Place-ID: 136

https://www.seilbahntechnik.net/en/lifts/855/datas.htm