Lift-Database » Lifts in the world
6-MGD Möseralmbahn
Mountain Station
Mountain Station
General information | |
---|---|
Place | Fiss |
resort | Snow Card Tirol |
Region | Tyrol |
Country | |
Name of lift | Möseralmbahn |
Type | 6-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 1995 |
Commissioning date | 1995 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
One yellow gondola. Rope was replaced by FATZER in April 2013. |
geometric data | |
---|---|
Height of valley station | 1473 m |
Height of mountain station | 1824 m |
Vertical rise | 351 m |
Route distance | 1644 m |
Horizontal length | 1606 m |
Average incline | 21,90 % |
Largest incline | 36,20 % |
Number of pillars | 12 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 4,80 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2364 Pers/h |
Travel time | 5,7 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | CWA |
Cab model | OMEGA 6s |
Seating | carpet |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 6 |
Number of cabs | 84 Stk |
Cab distance | 45,7 m |
Cab interval | 9,1 s |
Garage type | underground |
Garage place | valley station |
Garage direction | backward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | 3460 m |
Total weight of haul rope | 24 t |
Haul rope diameter | 43 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | no |
Integrated rescue system | no |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 10/03/24
PHOTOS: ??
Lift-Statistics
31313 visit(s) since 19/09/03
Last visit 15/01/25
LIFT-WORLD IDs
Lift-ID: 856
Place-ID: 136
https://www.seilbahntechnik.net/en/lifts/856/datas.htm
Datas: 10/03/24
PHOTOS: ??
Lift-Statistics
31313 visit(s) since 19/09/03
Last visit 15/01/25
LIFT-WORLD IDs
Lift-ID: 856
Place-ID: 136
https://www.seilbahntechnik.net/en/lifts/856/datas.htm