Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLF Plan des Fours


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Notre-Dame-de-Bellecombe
resort Espace Diamant
Region Rhône-Alpes
Country FR France
Name of lift Plan des Fours 
Type 4-CLF 
Lift manufacturer GMM 
Year of construction 1990 
Commissioning date 1990

geometric data  
Height of valley station 1730 m
Height of middle station(s) ?? m
Height of mountain station 2055 m
Vertical rise 325 m
Route distance 811 m
Horizontal length ?? m
Average incline 39,8 %
Largest incline 56 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 5,9 min
Driving speed line 2,3 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 208 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Montaz Mautino
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs 73 Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/01/18 09:03:26
PHOTOS: 04/08/18 20:59:58

Lift-Statistics
2851 visit(s) since 06/04/06
Last visit 26/02/21

LIFT-WORLD IDs
Lift-ID: 8582
Place-ID: 1151

https://www.seilbahntechnik.net/en/lifts/8582/datas.htm