Lift-Database » Lifts in the world
8-MGD Speikboden
Line
Valley Station
Line
General information | |
---|---|
Place | Sand in Taufers / Campo Tures |
resort | Speikboden |
Region | Trentino-South Tyrol |
Country | |
Name of lift | Speikboden |
Type | 8-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 2005 |
Commissioning date | 06/12/05 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 950 m |
Height of mountain station | 1958 m |
Vertical rise | 1008 m |
Route distance | 2884 m |
Horizontal length | 2650 m |
Average incline | 38,58 % |
Largest incline | 81,4 % |
Number of pillars | 28 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 5,2 m |
Trackwidth line | 5,2 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2400 Pers/h |
Travel time | 8 min |
Driving speed line | 6,00 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | BMB |
Remote control and telemonitoring system | ?? |
Power control system | BMB |
Number of drive | 2 Stk |
Drive power (Start) | 1306 kW |
Drive power (Operation) | 359 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | A108 |
Cab manufacturer | CWA |
Cab model | 8E98 |
Seating | carpet |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 8 |
Number of cabs | 90 Stk |
Cab distance | 72 m |
Cab interval | 12 s |
Garage type | ground floor |
Garage place | mountain station |
Garage direction | forward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | 5760 m |
Total weight of haul rope | 70 t |
Haul rope diameter | 54 mm |
Nominal strength of haul rope | 1960 N/mm² |
Breaking strength of rope | 2526 kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | 7 m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 6 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Rope position control | yes |
Asset number (Trail map) | ?? |
Updates
Datas: 02/08/21
PHOTOS: ??
Lift-Statistics
13921 visit(s) since 04/12/05
Last visit 14/10/24
LIFT-WORLD IDs
Lift-ID: 8692
Place-ID: 1580
https://www.seilbahntechnik.net/en/lifts/8692/datas.htm
Datas: 02/08/21
PHOTOS: ??
Lift-Statistics
13921 visit(s) since 04/12/05
Last visit 14/10/24
LIFT-WORLD IDs
Lift-ID: 8692
Place-ID: 1580
https://www.seilbahntechnik.net/en/lifts/8692/datas.htm