Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Punta Bagna 1



General information  
Place Valfréjus 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift Punta Bagna 1 
Type 6-MGD 
Lift manufacturer Skirail 
Year of construction 1983 
Commissioning date ?? 
Date of closing down 17 Apr 2009 
Date of pull down 2009 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Manufactured by Skirail on Agudio license.

geometric data  
Height of valley station 1553 m
Height of mountain station 2221 m
Vertical rise 668 m
Route distance 2325 m
Horizontal length ?? m
Average incline ?? %
Largest incline 45 %
Number of pillars 22 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1029 Pers/h
Travel time 10 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating duckboard (plastic) 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 65 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19 Apr 2026
PHOTOS: ??

Lift-Statistics
4728 visit(s) since 14 Dec 2005
Last visit 13 May 2026

LIFT-WORLD IDs
Lift-ID: 8777
Place-ID: 1238

https://www.seilbahntechnik.net/en/lifts/8777/datas.htm