Lift-Database » Lifts in the world
4-CLF Moulin Benjamin
Valley Station
Line
Mountain Station
General information | |
---|---|
Place | Valloire |
resort | Galibier - Thabor |
Region | Rhône-Alpes |
Country | |
Name of lift | Moulin Benjamin |
Type | 4-CLF |
Lift manufacturer | Poma |
Year of construction | 2002 |
Commissioning date | 2002 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1468 m |
Height of mountain station | 1674 m |
Vertical rise | 206 m |
Route distance | 789 m |
Horizontal length | 757 m |
Average incline | 26 % |
Largest incline | 76 % |
Number of pillars | 9 Stk |
Greatest spanwidth | 141 m |
Max ground clearance | 20 m |
Trackwidth drive | 4,9 m |
Trackwidth line | 4,9 m |
Trackwidth return | 4,9 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2000 Pers/h |
Travel time | 6,2 min |
Driving speed line | 2,1 m/s |
electrical data | |
---|---|
Electrical control | Semer |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 1 Stk |
Drive power (Start) | 190 kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Poma |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 107 Stk |
Cab distance | 15,12 m |
Cab interval | 7,2 s |
rope data | |
---|---|
Rope manufacturer | Tréfileurope |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 41 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 02/04/22
PHOTOS: ??
Lift-Statistics
6118 visit(s) since 17/01/06
Last visit 22/11/24
LIFT-WORLD IDs
Lift-ID: 8787
Place-ID: 1239
https://www.seilbahntechnik.net/en/lifts/8787/datas.htm
Datas: 02/04/22
PHOTOS: ??
Lift-Statistics
6118 visit(s) since 17/01/06
Last visit 22/11/24
LIFT-WORLD IDs
Lift-ID: 8787
Place-ID: 1239
https://www.seilbahntechnik.net/en/lifts/8787/datas.htm