  6-CLD Romains

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Alpe d'Huez 
resort Alpe d'Huez 
Region Rhône-Alpes 
Country   
Name of lift Romains 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2005 
Commissioning date 2005 


Infos for handicapped persons
Lift may be slowed or stopped for person(s) to load

Characteristics
Lift tensioning in both stations

geometric data  
Height of valley station 1810 m
Height of mountain station 2025 m
Vertical rise 215 m
Route distance 1133 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3600 Pers/h
Travel time 3,75 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 373 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type LPA 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 81 Stk
Cab distance 30 m
Cab interval 6 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/12/17
PHOTOS: ??

Lift-Statistics
10027 visit(s) since 29/04/06
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 9365
Place-ID: 229

https://www.seilbahntechnik.net/en/lifts/9365/datas.htm