Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD du Rosay



General information  
Place Le Grand-Bornand 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift du Rosay 
Type 10-MGD 
Lift manufacturer Poma 
Year of construction 1986 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 940 m
Height of middle station(s) ?? m
Height of mountain station 1450 m
Vertical rise 510 m
Route distance 2256 m
Horizontal length ?? m
Average incline 23 %
Largest incline 61 %
Number of pillars 22 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 7,86 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 850 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type TB50 D49 
Cab manufacturer Gangloff 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab 10 
Number of cabs 55 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Mar 9, 2025
PHOTOS: ??

Lift-Statistics
9384 visit(s) since May 20, 2006
Last visit Apr 11, 2025

LIFT-WORLD IDs
Lift-ID: 9427
Place-ID: 1078

https://www.seilbahntechnik.net/en/lifts/9427/datas.htm