Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Planai I








Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Schladming
resort Schladming Dachstein Tauern
Ski amadé
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Planai I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1985 
Commissioning date 1985
Date of closing down 07/04/19
Date of pull down 08/04/19

geometric data  
Height of valley station 750 m
Height of mountain station 1350 m
Vertical rise 600 m
Route distance 1681 m
Horizontal length ?? m
Average incline 38,20 %
Largest incline 75,90 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2233 Pers/h
Travel time 5,74 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 570 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA 6s
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 83 Stk
Cab distance ?? m
Cab interval ?? s
Garage type emergency rail
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ATS 
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/11/19 21:32:04
PHOTOS: 08/03/08 18:41:00

Lift-Statistics
16098 visit(s) since 19/01/03
Last visit 28/05/20

LIFT-WORLD IDs
Lift-ID: 1482
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/1482/datas.htm