General information  
Place Schladming 
resort ?? 
Region Styria 
Country   
Name of lift Planaibahn I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1985 
Commissioning date 1985 
Date of closing down 07/04/19 
Date of pull down 07/04/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 750 m
Height of mountain station 1350 m
Vertical rise 600 m
Route distance 1681 m
Horizontal length ?? m
Average incline 38,20 %
Largest incline 75,90 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2233 Pers/h
Travel time 5,74 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 570 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 215 
Cab manufacturer CWA 
Cab model OMEGA 6s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 83 Stk
Cab distance ?? m
Cab interval ?? s
Garage type emergency rail 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13/01/23