Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Aup de Véran


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Flaine
resort
Region Rhône-Alpes
Country FR France
Name of lift Aup de Véran 
Type 8-MGD 
Lift manufacturer Poma 
Year of construction 2012 
Commissioning date ??

geometric data  
Height of valley station 1582 m
Height of middle station(s) ?? m
Height of mountain station 2198 m
Vertical rise 616 m
Route distance 2254 m
Horizontal length 2195 m
Average incline 28 %
Largest incline 51 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 6,5 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope 47 t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 673 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer Sigma
Cab model DIAMOND - C8S210
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 57 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system ??
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 16/10/15 22:08:57
PHOTOS: 26/03/13 14:29:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6895 visit(s) since 03/11/12
Last visit 21/11/19

LIFT-WORLD IDs
Lift-ID: 16082
Place-ID: 1020

https://www.seilbahntechnik.net/en/lifts/16082/datas.htm