Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Aup de Véran

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Flaine 
resort Grand Massif 
Region Rhône-Alpes 
Country   
Name of lift Aup de Véran 
Type 8-MGD 
Lift manufacturer Poma 
Year of construction 2012 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1582 m
Height of middle station(s) ?? m
Height of mountain station 2198 m
Vertical rise 616 m
Route distance 2254 m
Horizontal length 2195 m
Average incline 28 %
Largest incline 51 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 6,5 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 673 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Sigma 
Cab model DIAMOND - C8S210 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 57 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope 47 t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/10/15
PHOTOS: ??

Lift-Statistics
10538 visit(s) since 03/11/12
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 16082
Place-ID: 1020

https://www.seilbahntechnik.net/en/lifts/16082/datas.htm