Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Légette





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Les Saisies
resort Espace Diamant
Region Rhône-Alpes
Country FR France
Name of lift Légette 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2019 
Commissioning date 21/12/19

geometric data  
Height of valley station 1565,3 m
Height of mountain station 1859,05 m
Vertical rise 293,75 m
Route distance 1093 m
Horizontal length 1074,05 m
Average incline 28 %
Largest incline 61 %
Number of pillars 11 Stk
Greatest spanwidth 180, m
Max ground clearance 25 m
Trackwidth drive 6,1 m
Trackwidth line 6,1 m
Trackwidth return 6,1 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 3,58 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 600 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA-M
Cab manufacturer Leitner
Cab model ??
Seating ??
Seat heater ??
Persons per cab
Number of cabs 64 Stk
Cab distance 38,57 m
Cab interval 7,7 s
Garage type station circulation
Garage place in all stations
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left
Construction costs 7  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/01/20 14:59:59
PHOTOS: ????

Lift-Statistics
735 visit(s) since 05/01/20
Last visit 20/09/20

LIFT-WORLD IDs
Lift-ID: 19058
Place-ID: 1117

https://www.seilbahntechnik.net/en/lifts/19058/datas.htm