Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Légette



General information  
Place Les Saisies 
resort Espace Diamant 
Region Rhône-Alpes 
Country   
Name of lift Légette 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2019 
Commissioning date 21/12/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1565,3 m
Height of mountain station 1859,05 m
Vertical rise 293,75 m
Route distance 1093 m
Horizontal length 1074,05 m
Average incline 28 %
Largest incline 61 %
Number of pillars 11 Stk
Greatest spanwidth 180, m
Max ground clearance 25 m
Trackwidth drive 6,1 m
Trackwidth line 6,1 m
Trackwidth return 6,1 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 3,58 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive 1 Stk
Drive power (Start) 662 kW
Drive power (Operation) 600 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type LPA-M 
Cab manufacturer Leitner 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 64 Stk
Cab distance 38,57 m
Cab interval 7,7 s
Garage type station circulation 
Garage place in all stations 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 20/08/22
PHOTOS: ??

Lift-Statistics
3422 visit(s) since 05/01/20
Last visit 22/11/24

LIFT-WORLD IDs
Lift-ID: 19058
Place-ID: 1117

https://www.seilbahntechnik.net/en/lifts/19058/datas.htm