Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


15-MGD Steinplatte


Line
Line


Infos for handicapped persons
At ground level entry.

Characteristics
nothing

General information  
Place Waidring
resort 3 Laender Freizeit-Arena
Steinplatte
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Steinplatte 
Type 15-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date ??

geometric data  
Height of valley station 781 m
Height of mountain station 1651 m
Vertical rise 870 m
Route distance 2813 m
Horizontal length 2680 m
Average incline 33,00 %
Largest incline 77,00 %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2500 Pers/h
Travel time 7,81 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 1200 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DT 215
Cab manufacturer CWA
Cab model CONUS 15
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab 15 
Number of cabs 49 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction forward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map)




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/02/21 20:43:47
PHOTOS: 30/05/04 18:56:20

Lift-Statistics
26889 visit(s) since 21/11/02
Last visit 27/09/21

LIFT-WORLD IDs
Lift-ID: 709
Place-ID: 6

https://www.seilbahntechnik.net/en/lifts/709/datas.htm