Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6/8-CGD Karkogel


Line
Line

Mountainstation
Mountainstation


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Abtenau
resort
Region Salzburg
Country AT Austria, Österreich
Name of lift Karkogel 
Type 6/8-CGD 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ??

geometric data  
Height of valley station 742 m
Height of mountain station 1139 m
Vertical rise 397 m
Route distance 1345,97 m
Horizontal length 1282,50 m
Average incline 30,96 %
Largest incline 55,40 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,40 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1326 (2400) Pers/h
Travel time 5,64 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 2766,78 m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 540 kW
Drive power (Operation) 440 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Carvatech
Cab model ??
Bubble colour
Seating ??
Seat heater no
Persons per cab 6/8 
Number of cabs 18/18 (57) Stk
Cab distance 95 (60) m
Cab interval 19 (12) s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 40 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Situation of entrance ??
Situation of exit ??
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 01/12/16 21:47:30
PHOTOS: 05/10/08 23:00:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11160 visit(s) since 01/07/05
Last visit 19/02/20

LIFT-WORLD IDs
Lift-ID: 7132
Place-ID: 11

https://www.seilbahntechnik.net/en/lifts/7132/datas.htm