Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6/8-CGD Karkogelbahn

Line
Line

Mountainstation
Mountainstation

General information  
Place Abtenau 
resort ?? 
Region Salzburg 
Country   
Name of lift Karkogelbahn 
Type 6/8-CGD 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 742 m
Height of mountain station 1139 m
Vertical rise 397 m
Route distance 1345,97 m
Horizontal length 1282,50 m
Average incline 30,96 %
Largest incline 55,40 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,40 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1326 (2400) Pers/h
Travel time 5,64 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 540 kW
Drive power (Operation) 440 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Carvatech 
Cab model ?? 
Bubble colour ?? 
Seating ?? 
Seat heater no 
Persons per cab 6/8 
Number of cabs 57 Stk
Cab distance 95 (60) m
Cab interval 19 (12) s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 2766,78 m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 40 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/10/23
PHOTOS: ??

Lift-Statistics
15029 visit(s) since 01/07/05
Last visit 16/04/24

LIFT-WORLD IDs
Lift-ID: 7132
Place-ID: 11

https://www.seilbahntechnik.net/en/lifts/7132/datas.htm